codigo0/node_modules/date-fns/interval.mjs
planetazuzu 5d7a6500fe refactor: Fase 1 - Clean Architecture, refactorización modular y eliminación de duplicidades
-  Ticket 1.1: Estructura Clean Architecture en backend
-  Ticket 1.2: Schemas Zod compartidos
-  Ticket 1.3: Refactorización drugs.ts (1362 → 8 archivos modulares)
-  Ticket 1.4: Refactorización procedures.ts (3583 → 6 archivos modulares)
-  Ticket 1.5: Eliminación de duplicidades (~50 líneas)

Cambios principales:
- Creada estructura Clean Architecture en backend/src/
- Schemas Zod compartidos en backend/src/shared/schemas/
- Refactorización modular de drugs y procedures
- Utilidades genéricas en src/utils/ (filter, validation)
- Eliminados scripts obsoletos y documentación antigua
- Corregidos errores: QueryClient, import test-error-handling
- Build verificado y funcionando correctamente
2026-01-25 21:09:47 +01:00

42 lines
1.4 KiB
JavaScript

import { toDate } from "./toDate.mjs";
/**
* The {@link interval} function options.
*/
/**
* @name interval
* @category Interval Helpers
* @summary Creates an interval object and validates its values.
*
* @description
* Creates a normalized interval object and validates its values. If the interval is invalid, an exception is thrown.
*
* @typeParam DateType - The `Date` type, the function operates on. Gets inferred from passed arguments. Allows to use extensions like [`UTCDate`](https://github.com/date-fns/utc).
*
* @param start - The start of the interval.
* @param end - The end of the interval.
* @param options - The options object.
*
* @throws `Start date is invalid` when `start` is invalid.
* @throws `End date is invalid` when `end` is invalid.
* @throws `End date must be after start date` when end is before `start` and `options.assertPositive` is true.
*
* @returns The normalized and validated interval object.
*/
export function interval(start, end, options) {
const _start = toDate(start);
if (isNaN(+_start)) throw new TypeError("Start date is invalid");
const _end = toDate(end);
if (isNaN(+_end)) throw new TypeError("End date is invalid");
if (options?.assertPositive && +_start > +_end)
throw new TypeError("End date must be after start date");
return { start: _start, end: _end };
}
// Fallback for modularized imports:
export default interval;